CONCRETE PRIVATE DOCK AND BOAT HOIST

Myrick Marine provided installation of concrete pilings to support two high capacity boat hoists and also constructed concrete floating docks secured with concrete piles. Each hoist has a walkway that utilizes hollow core slabs supported by concrete piles. Additionally, an aluminum gangway was built to get from the fixed pier to the floating docks. Previous […]

CONCRETE DOCK AND WOOD DOCK HOUSE

Installation of a concrete fixed pier using pre-stressed concrete pile with concrete pile caps and concrete double tee slabs. Once the concrete was installed we built a wooden dock house to the customer specifications and then installed an Aluminum walkway to the existing floating dock. Previous Next

PRIVATE DOCK WITH ALUMINUM WALKWAY ON CONCRETE PILE

Myrick Marine assisted in the replacement of a wooden dock with a zero-maintenance concrete and aluminum dock on the Herb River in Savannah, GA. We utilized a floating crane and barge to construct a 300’ long walkway to a fixed pier with adjoining floating dock. Previous Next

CONCRETE PRIVATE DOCK

Myrick Marine was contracted to construct this private dock using concrete pile and pile caps, along with concrete double tees for the fixed pier. Concrete floating docks of approximately 150 LF were also secured with concrete piling. Additionally, a 24,000 lb boat lift and a 5,000 lb jet ski lift were installed. Once the pier […]

IPE PRIVATE DOCK

Myrick Marine constructed this private dock using Ipe hardwood for the handrail and the walking surfaces. We installed timber pile for the walkway and fixed pier, and concrete pile was used for the floating dock which was also custom built using Ipe as the deck surface and stainless pile guides. Previous Next

TIMBER PILE FOUNDATION

Due to the nature of the soil on the island where this house was being built, settling was a potential problem, so the owner hired Myrick Marine to keep that from happening. We installed a foundation using our Movax SP-100 to drive approximately 67 timber piles that were each 55’ long. This two-story house was […]

TIMBER PILE FOR HOUSE FOUNDATION

72 treated timber pile 50′ in length driven to grade with our Movax vibratory hammer. Owner and General Contractor were pleased with the quick and clean job installing these pile. Previous Next